Post by Brian Ayers, CSCS on Oct 22, 2013 8:29:40 GMT -5
Progress on the build out at our second location is moving along. All the demo is completed and the locker room walls have been framed out. They have also completed the plumbing and are working on installing the electrical and bathroom fixtures. After that it's sheetrock and paint. In the mean time I have given the green light to ship the rigs for the boot camp and boxing areas so they should be arriving within a week or so. You can see pics on our facebook page
|
|